anyone heard or know how long the closure will be for? - dizzylandjunky
203.4 #1577 9:06AM
The Matterhorn is going to have two decently long refurb shutdowns. This first one will last til around September 1st. Mainly track and cosmetics are being done right now with some possible testing of the new sleds.
The second refurb closure will be until shortly after New Years, and thats when they are supposed to install the new sleds and change the loading gates. - Fade2blk
303.0 #595 10:13AM
Yeah they are making the track wider for the new cars. September 2nd is so far away!! I miss Harold - Storybrooke